How Long Does It Take to Build a Website? Real Timelines for 2026
Real timelines for business websites, online stores and web apps, from a team that publishes them, plus what speeds a project up or slows it down.

The short answer
- A small business website takes about 2 weeks once the content is ready.
- Custom-designed sites take 3 to 5 weeks, online stores 3 to 10 weeks and web apps 8 to 14 weeks.
- Content and feedback, not the build, cause most delays.
- Prepare text, images, logins and one decision-maker before the project starts.
A small business website usually takes about 2 weeks to build once the content is ready. A custom-designed site takes 3 to 5 weeks, an online store 3 to 10 weeks, and a web application 8 to 14 weeks or more. The build itself is rarely what slows a project down. Content, feedback and approvals are. This guide breaks down real timelines, shows a week-by-week schedule and explains how to launch sooner.
Website timelines at a glance
| Project | Typical timeline |
|---|---|
| Landing page | 5 to 7 days |
| Small business website (up to 5 pages) | About 2 weeks |
| Custom-designed business website (up to 12 pages) | 3 to 5 weeks |
| Larger site with bookings, memberships or languages (up to 25 pages) | 4 to 7 weeks |
| Next.js website with a headless CMS (up to 8 pages) | 3 to 5 weeks |
| Starter online store (up to 30 products) | About 3 weeks |
| Custom-designed store (up to 150 products) | 4 to 6 weeks |
| Store with subscriptions, B2B pricing or integrations | 6 to 10 weeks |
| Web application MVP, portal or internal tool | 8 to 14 weeks |
The stages of a website project
- Discovery and planning (2 to 5 days). Goals, pages, features, content and success measures are agreed in a short written brief.
- Design (1 to 2 weeks for custom work). Key pages are designed and approved before development starts. Template-based sites skip most of this stage.
- Build (1 to 4 weeks). The site is developed on a private preview link you can click through.
- Content (runs alongside). Text, images and products are added. This is the most common cause of delay.
- Testing (2 to 5 days). Forms, speed, mobile layouts, browsers and redirects are checked.
- Launch and handover (1 to 2 days). The site goes live, is checked again and your team is trained.
A week-by-week example: 12-page custom website
Here is a realistic schedule for a custom-designed business website, the kind that takes 3 to 5 weeks when content and feedback arrive on time:
| Week | What happens | What you do |
|---|---|---|
| Week 1 | Kickoff call, written brief, sitemap and home page design | Share goals, examples you like and existing content |
| Week 2 | Remaining key page designs; content collection | Approve designs and send final text and images |
| Week 3 | Build on a private preview site | Click through and send one round of feedback |
| Week 4 | Content added, speed and mobile checks, forms tested | Final review and sign-off |
| Week 5 (if needed) | Fixes, redirects from an old site, launch and training | Approve go-live |
From our projects: On our projects, the build rarely causes delays. The most common hold-up is waiting for final text and images, so we ask for content early and can write it for you at $49 per page.
How long do other projects take?
Website redesigns and migrations
A redesign usually takes as long as a new site, sometimes longer, because existing pages must be mapped and redirected. Moving a WordPress site to a new host takes 1 to 3 days. Moving to WordPress from another platform takes 2 to 4 weeks for up to 30 pages, and large sites or stores take 4 to 8 weeks. Our WordPress migration page explains each option.
Online stores
Store timelines depend mostly on product data. Fifty simple products with clean photos are quick to load. A thousand products with sizes, colours and variants take much longer, even with bulk imports. See our ecommerce website cost guide for how catalogue size affects budget too.
Web applications
Portals, dashboards and internal tools take 8 to 14 weeks for a first release, because user roles, data and integrations all need building and testing. Our web app development cost guide covers scope and budget in detail.
What to prepare before the project starts
A short preparation list saves more time than any shortcut in the build. Before kickoff, gather:
| Item | Why it matters |
|---|---|
| Page list and sitemap | Fixes the scope, so the quote and timeline stay accurate |
| Final text for each page | Content is the most common cause of delay |
| Logo, brand colours and fonts | Design can start on day one instead of waiting for files |
| Photos, or a decision to use licensed stock | Images shape layouts, so they are needed before design is signed off |
| Logins for domain, hosting and email | Launch can’t happen without DNS and hosting access |
| Two or three sites you like, and why | Gives the designer a clear direction and cuts revision rounds |
| One named decision-maker | Feedback arrives once, in one place, instead of in conflicting pieces |
If some of this isn’t ready, say so at the start. A realistic plan built around missing content is far better than a fast plan that stalls in week two.
What makes a website take longer?
- Content that isn’t ready when the build starts.
- Several people approving designs, with feedback arriving at different times.
- Custom features such as bookings, memberships, calculators or integrations.
- Waiting for logins to hosting, domains or third-party tools.
- Moving a large existing site, which needs a URL map and redirects to protect rankings.
- Changing the scope halfway through the project.
How to get your website live faster
- Write or collect your page content before the project starts.
- Name one person who gives feedback and approves each stage.
- Gather logins for your domain, hosting and tools in advance.
- Launch with the pages you need now and add the rest later.
- Use proven layouts for less important pages and save custom design for key pages.
- Agree the scope in writing, so new ideas go into a phase two list.
Don’t skip testing to save a week
What the research says: Google uses the mobile version of a site’s content, crawled with its smartphone agent, for indexing and ranking. A site that looks fine on desktop but breaks on phones can hurt you in search. (Source: Google Search Central.)
A few days of testing on real phones, checking forms and speed, and confirming redirects is far cheaper than fixing problems after launch. If you are also budgeting, our guides to WordPress website costs and small business website costs explain what drives the price.
Website timeline questions
Can a website be built in a week?
A single landing page can be ready in 5 to 7 days. A full business website with several pages usually needs at least 2 weeks to plan, build, test and launch properly.
How long does a WordPress website take?
A small WordPress site takes about 2 weeks, a custom-designed one 3 to 5 weeks, and a larger site with bookings or memberships 4 to 7 weeks.
How long does an online store take?
A starter store takes about 3 weeks. A custom-designed store takes 4 to 6 weeks, and stores with subscriptions or integrations take 6 to 10 weeks.
Why do website projects get delayed?
The most common reason is content: text, images or products that aren’t ready. Slow feedback, missing logins and scope changes are the next most common.
Does a redesign take as long as a new site?
Usually yes, and sometimes longer, because existing pages must be mapped and redirected so you keep your search rankings.
How many rounds of changes are included?
At Attors, website plans include 2, 3 or 4 revision rounds depending on the plan. Extra rounds are charged at the hourly rate, and we always tell you first.
Get a timeline for your project
Every project is different. Tell us what you need and we reply within one business day with questions or a written quote and a realistic timeline.
Sources
- Google Search Centraldevelopers.google.com/search/docs/crawling-indexing/mobile/mobile-sites-mobile-first-indexing
Keep reading
More in Website StrategyWebsite Strategy
Website Design Brief Template: What to Include (With Example)
Use this website design brief template to explain your goals, audience, pages, features, budget and timeline, and get accurate quotes from web designers.
Website Strategy
How Much Does a Website Redesign Cost in 2026?
Real website redesign prices for 2026, what makes a redesign cost more and how to keep your search rankings during the change.
Website Strategy
How to Choose a Web Development Company: 12 Questions to Ask
Twelve questions to ask before hiring a web development company, the red flags to watch for and how to compare quotes fairly.