How Long Does It Take to Build a Website? Real Timelines for 2026

Real timelines for business websites, online stores and web apps, from a team that publishes them, plus what speeds a project up or slows it down.

Project director planning a website timeline at her desk

The short answer

  • A small business website takes 7 to 10 days once the content is ready.
  • Custom-designed sites take 2 to 3 weeks, online stores 7 days to 5 weeks and web apps 6 to 12 weeks.
  • Content and feedback, not the build, cause most delays.
  • Prepare text, images, logins and one decision-maker before the project starts.

A small business website usually takes 7 to 10 days to build once the content is ready. A custom-designed site takes 2 to 3 weeks, an online store 7 days to 5 weeks, and a web application 6 to 12 weeks or more. The build itself is rarely what slows a project down. Content, feedback and approvals are. This guide breaks down real timelines, shows a day-by-day schedule and explains how to launch sooner.

Website timelines at a glance

ProjectTypical timeline
Landing page4 to 5 days
Small business website (6 main pages plus a page for each service, up to 8)7 to 10 days
Custom-designed business website (up to 12 main pages)2 to 3 weeks
Larger site with bookings, memberships or languages (20 or more main pages)3 to 5 weeks
Next.js website with a headless CMS (up to 8 designed pages)2 to 4 weeks
Starter online store (up to 30 products)7 to 14 days
Custom-designed store (up to 150 products)2 to 3 weeks
Store with subscriptions, B2B pricing or integrations3 to 5 weeks
Web application MVP, portal or internal tool6 to 12 weeks
Attors Technologies’ published project timelines, checked 12 November 2026.

The stages of a website project

  1. Discovery and planning (1 to 2 days). Goals, pages, features, content and success measures are agreed in a short written brief.
  2. Design (3 to 5 days for custom work). Key pages are designed and approved before development starts. Template-based sites skip most of this stage.
  3. Build (3 to 10 days). The site is developed on a private preview link you can click through.
  4. Content (runs alongside). Text, images and products are added. This is the most common cause of delay.
  5. Testing (1 to 2 days). Forms, speed, mobile layouts, browsers and redirects are checked.
  6. Launch and handover (1 day). The site goes live, is checked again and your team is trained.

A day-by-day example: 12-page custom website

Here is a realistic schedule for a custom-designed business website, the kind that takes 2 to 3 weeks when content and feedback arrive on time:

DaysWhat happensWhat you do
Days 1 to 2Kickoff call, written brief, sitemap and home page designShare goals, examples you like and existing content
Days 3 to 5Remaining key page designs; content collectionApprove designs and send final text and images
Days 6 to 12Build on a private preview siteClick through and send your feedback in one place
Days 13 to 17Content added, speed and mobile checks, forms testedFinal review and sign-off
Days 18 to 21 (if needed)Fixes, redirects from an old site, launch and trainingApprove go-live
Illustrative schedule based on Attors’ published 2 to 3 week timeline for custom-designed sites.

From our projects: On our projects, the build rarely causes delays. The most common hold-up is waiting for final text and images, so we ask for content early and can write it for you from a short questionnaire, included in every website package.

How long do other projects take?

Website redesigns and migrations

A redesign usually takes as long as a new site, sometimes longer, because existing pages must be mapped and redirected. Moving a WordPress site to a new host takes 1 to 2 days. Moving to WordPress from another platform takes 1 to 2 weeks for up to 30 pages, and large sites or stores take 2 to 5 weeks. Our WordPress migration page explains each option.

Online stores

Store timelines depend mostly on product data. Fifty simple products with clean photos are quick to load. A thousand products with sizes, colours and variants take much longer, even with bulk imports. See our ecommerce website cost guide for how catalogue size affects budget too.

Web applications

Portals, dashboards and internal tools take 6 to 12 weeks for a first release, because user roles, data and integrations all need building and testing. Our web app development cost guide covers scope and budget in detail.

What to prepare before the project starts

A short preparation list saves more time than any shortcut in the build. Before kickoff, gather:

ItemWhy it matters
Page list and sitemapFixes the scope, so the quote and timeline stay accurate
Final text for each pageContent is the most common cause of delay
Logo, brand colours and fontsDesign can start on day one instead of waiting for files
Photos, or a decision to use licensed stockImages shape layouts, so they are needed before design is signed off
Logins for domain, hosting and emailLaunch can’t happen without DNS and hosting access
Two or three sites you like, and whyGives the designer a clear direction and cuts back-and-forth on the design
One named decision-makerFeedback arrives once, in one place, instead of in conflicting pieces
A preparation checklist for website projects.

If some of this isn’t ready, say so at the start. A realistic plan built around missing content is far better than a fast plan that stalls in week two.

What makes a website take longer?

  • Content that isn’t ready when the build starts.
  • Several people approving designs, with feedback arriving at different times.
  • Custom features such as bookings, memberships, calculators or integrations.
  • Waiting for logins to hosting, domains or third-party tools.
  • Moving a large existing site, which needs a URL map and redirects to protect rankings.
  • Changing the scope halfway through the project.

How to get your website live faster

  1. Write or collect your page content before the project starts.
  2. Name one person who gives feedback and approves each stage.
  3. Gather logins for your domain, hosting and tools in advance.
  4. Launch with the pages you need now and add the rest later.
  5. Use proven layouts for less important pages and save custom design for key pages.
  6. Agree the scope in writing, so new ideas go into a phase two list.

Don’t skip testing to save a week

What the research says: Google uses the mobile version of a site’s content, crawled with its smartphone agent, for indexing and ranking. A site that looks fine on desktop but breaks on phones can hurt you in search. (Source: Google Search Central.)

A day or two of testing on real phones, checking forms and speed, and confirming redirects is far cheaper than fixing problems after launch. If you are also budgeting, our guides to WordPress website costs and small business website costs explain what drives the price.

Website timeline questions

Can a website be built in a week?

A single landing page can be ready in 4 to 5 days. A full business website with several pages usually needs 7 to 10 days to plan, build, test and launch properly.

How long does a WordPress website take?

A small WordPress site takes 7 to 10 days, a custom-designed one 2 to 3 weeks, and a larger site with bookings or memberships 3 to 5 weeks.

How long does an online store take?

A starter store takes 7 to 14 days, depending on the platform. A custom-designed store takes 2 to 3 weeks, and stores with subscriptions or integrations take 3 to 5 weeks.

Why do website projects get delayed?

The most common reason is content: text, images or products that aren’t ready. Slow feedback, missing logins and scope changes are the next most common.

Does a redesign take as long as a new site?

Usually yes, and sometimes longer, because existing pages must be mapped and redirected so you keep your search rankings.

How many rounds of changes are included?

At Attors, every website plan shows you the design first and changes it until you approve it, so there is no limit to count. Once the design is approved, further changes are quoted before any work starts.

Get a timeline for your project

Every project is different. Tell us what you need and we reply within one business day with questions or a written quote and a realistic timeline.

Sources

  1. Google Search Centraldevelopers.google.com/search/docs/crawling-indexing/mobile/mobile-sites-mobile-first-indexing
Written byAttors Editorial TeamWebsite planning, costs and strategy

The Attors Editorial Team writes and reviews our guides on website costs, planning and choosing the right platform, working with our developers and marketers so every guide reflects how projects are actually priced and delivered.

Website Strategy

How Much Does a WordPress Website Cost in 2026?

What a WordPress website costs in 2026: $349 to $1,490 to build and $20 to $250 a month to run, with hosting renewal prices, three worked budgets over three years and the itemised list a fair quote should follow.

Website Strategy

White-Label WordPress Partner: 10 Checks Before You Choose

A good white-label WordPress partner builds and fixes sites under your brand, never speaks to your client unless you ask, and puts scope, price, ownership and handover in writing before the first line of code.

Planning a website or need a fix?

Tell us what you need. We reply within one business day with questions or a written quote.

Start a project